Temporary structure for Wembley Arena.
Large temporary structure requiring holding down.
Refurbishment of Wembley Arena required the erection of a large temporary marquee to house the stage and seating. Built on the car park adjacent Wembley Stadium, the structure was built on a scaffold platform.
2 weeks.